 |
 |


SPCC COMPLIANCE
PowerTech can assist you in meeting the revised Federal Regulations concerning Spill Prevention
Control and Countermeasures Plan, 40 CFR Part 112. Call 770-209-9119 and ask for Larry Kincer.
SUBSTATION AUTOMATION
Services include integration of IED's, digital meters, interactive touch screen displays, RTU's,
and communication interface devices for local and remote computer terminals.
|
PowerTech's engineering staff has designed substations ranging in size from 2.5 MVA to 300 MVA and from
4.16 kV to 230 kV. PowerTech's services include:
- Site selection
- Access road route selection
- Site clearing and grading design
- Contract preparation
- Access road clearing and grading design and contract preparation
- Earth resistivity measurement
- Equipment specification and evaluation
- Station layout drawings
- Construction contract document preparation and evaluation
- Review shop drawings
- Construction monitoring
- Final inspection and start-up services.
PowerTech's Substation Department staff utilizes AutoCad or MicroStation software for
all construction drawings. PowerTech also maintains computer software to efficiently
perform the following services:
- Load flow and fault analysis
- Ground grid design
- Protective device coordination
PowerTech also provides services during construction. These services include resident
inspection and observation, periodic routine inspections to verify compliance with
specifications as well as start-up services.
|
|